Coyle BrennanStudio

Hudson Valley and Manhattan

We draw the house, then we build it.

One practice carries the house from the first walk of the site to the certificate of occupancy.

Architecture and construction, one contract

  1. Stage 01

    Site

    We walk the land before anything is drawn. Survey, soils, zoning, and the shale ledge that was never going to move.

    Survey and feasibility · written read, first budget range

  2. Stage 02

    Massing

    Two volumes, half a level apart, bridged over the ledge instead of cut into it. The rock becomes a room.

    Schematic · the shape of the number settles here

  3. Stage 03

    Drawing

    Plans, sections and details, priced as they are drawn. When something has to give, you choose which thing, early.

    One set · drawn and priced in the same room

  4. Stage 04

    Built

    Our own superintendent and carpenters. The person who drew the eave is on site the week it goes up.

    One contract · footing to cabinetry to the first winter

The promise, in four numbers

1

practice

Architects, estimators and carpenters at one table.

1

set of drawings

Drawn and priced by the people who will build it.

1

contract

Footing to cabinetry, one line of accountability.

1

number

Set early, carried honestly, no meeting at the end.

01 / cost

What it costs, before you have to ask.

Whole house rework, or a ground up custom home

A gut and reconfigure, a substantial addition, or a new house on land you already hold.

$350,000 to $1.2M

Larger ground up work, and full gut luxury

Bigger programme, bespoke millwork and metalwork, longer approvals, a longer site.

$3M and above

Design fee

A percentage of construction cost, in writing before a line is drawn.

Ask us

Construction budgets · not the fee

02 / work

One house, shown properly.

15:7 Image direction West elevation, last light. Warm raking sun, cladding shadow read across the boards. No people, no cars, no styling.
Plate 01 Ledge House, Hudson Valley. Ground up, designed and built by the studio.

Site

A north sloping acre with a shale ledge through the only buildable ground.

Constraint

Blasting the ledge out would have taken roughly a third of the construction budget.

Move

Two volumes, half a level apart, bridged over the rock instead of cut into it.

Built

By our own crew. The one change the ledge forced took three days.

Read the whole project

03 / practice

Eleven people, one table.

16:6 Image direction Interior, late afternoon. One shaft across a plaster wall, everything else in shadow. Long exposure, no fill, no styling.
Plate 02 Ledge House, the room over the rock.

Practice

Architecture and construction, under one roof and one contract.

Where

Hudson Valley and Manhattan.

Work

Ground up houses, whole house reworks, substantial additions.

Size

Eleven people, a small number of projects at a time.

Not for

Projects that must break ground next month, or the cheapest route to a finished house.

04 / start

Start a project conversation.

Three questions and an email address. No phone number, no sales call.

What do you have
Where you are
When you want to be living in it

It goes to one inbox inside the practice. We do not add you to anything and we do not pass it on.