Ledge House · Hudson Valley
A house that let the rock stay.
Removing the outcrop would have cost roughly a third of the build. So the house steps over it.
Drag to orbit
-
Stage 01
Site
A north sloping acre. The shale runs through the only ground worth building on, and hemlock holds the north edge.
Survey, soils, setbacks · the ledge stays
-
Stage 02
Massing
Two volumes, half a storey apart, bridged over the rock. The exposed ledge becomes the floor of the room between them.
Schematic · the move that saved a third of the build
-
Stage 03
Drawing
Full set, priced by our own estimators as it was drawn. The decision to keep the ledge was costed at schematic, not at tender.
Plans, sections, details · one set
-
Stage 04
Built
Framed, clad and finished by our own crew. The one change the rock forced took three days, because the people who drew it were standing on it.
One contract · to certificate of occupancy
01 / the house
Four decisions, in order.
Site
One acre, north slope, shale outcrop across the buildable ground. Hemlock on the north edge, drive from the west.
Constraint
Blasting and removing the ledge priced out at roughly a third of the construction budget. The rock was not going to move.
Move
Two volumes, half a storey apart, bridged over the ledge rather than cut into it.
Built
By the studio's own superintendent, carpenters and trades, through to certificate of occupancy and a return visit after the first winter.
02 / plates
Three frames, when it is photographed.
03 / start
Your site has its own ledge.
Tell us what it is. Three questions and an email address.