Ledge House · Hudson Valley
A house that let the rock stay.
Removing the outcrop would have cost roughly a third of the build. So the house steps over it.
Drag to orbit
-
Stage 01
Site
A north sloping acre. The shale runs through the only ground worth building on, and hemlock holds the north edge.
Survey, soils, setbacks · the ledge stays
-
Stage 02
Massing
Two volumes, half a storey apart, bridged over the rock. The exposed ledge becomes the floor of the room between them.
Schematic · the move that saved a third of the build
-
Stage 03
Drawing
Full set, priced by our own estimators as it was drawn. The decision to keep the ledge was costed at schematic, not at tender.
Plans, sections, details · one set
-
Stage 04
Built
Framed, clad and finished by our own crew. The one change the rock forced took three days, because the people who drew it were standing on it.
One contract · to certificate of occupancy
01 / the house
Four decisions, in order.
Site
One acre, north slope, shale outcrop across the buildable ground. Hemlock on the north edge, drive from the west.
Constraint
Blasting and removing the ledge priced out at roughly a third of the construction budget. The rock was not going to move.
Move
Two volumes, half a storey apart, bridged over the ledge rather than cut into it.
Built
By the studio's own superintendent, carpenters and trades, through to certificate of occupancy and a return visit after the first winter.
02 / plates
Three frames of the house.
03 / start
Your site has its own ledge.
Tell us what it is. Three questions and an email address.
A concept study by New Creative Design
Fewer calls that were never going to fit. More that will.
Built for
- Design-build firms that win on trust, not on price
- Custom home builders whose clients ask “what will it cost?” before anything else
- Architects who build, or builders who design, and need one story for both
-
The budget, before the first call
Published construction ranges by project type, so the right clients choose you and the wrong ones choose themselves out.
Outcome Qualified calls
-
A three-question brief
What they own, where they are, when they want to live in it: three taps and an email, so the first meeting starts with their site, not with a form.
Outcome Complete inquiries
-
One house, shown properly, then filmed
The site, the constraint, the move and the build as a page, and as a 30-second film blocked in 3D (see the Homestead film).
Outcome Recall
Starts with Launch System · $3,000–$5,000 · live in 8–10 working days. Already happy with your site? The Answer & Book Kit adds the pricing pages and the brief in 5–7 working days, quoted in USD before we start.
Coyle Brennan Studio is an invented brand. The preview is built on your business, before any payment.